SAPEI (TERNA) 24 novembre 2010
Home
Che cos'č il Cigrč
 Elenco comitati
Comitati di Studio
 A1 Rotating Electrical Machines
A3 High Voltage Equipment
A2 Transformers
B1 Insulated Cables
B3 Substations
B2 Overhead Lines
B4 HVDC & Power Electronics
B5 Protection & Automation
C1 System Development & Economics
C2 System Operation & Control
C3 System Environmental Performance
C4 System Technical Performance
C5 Electricity Markets & Regulation
C6 Distribution Systems & Dispersed Generation
D1 Materials & Emerging Technologies
D2 Information Systems & Telecommunication
Iscrizione al Cigre
 Iscrizione 2012
Comitato nazionale italiano
 Documenti ufficiali Cigre - Statuto
Elenco Membri Comitato Nazionale Cigre
Notizie dal CNI
 Notizie pubblicate
Eventi CIGRE
Links
Cerca
Login / Logout
Mappa del sito


   English

 Logged in as:
 Guest


 Hosted by CESI

 Powered by Ezy Edit

> Comitati di Studio > C1 System Development & Economics

C1 System Development & Economics

Chairman (dal 2008): Phil Southwell (Australia)

Membro Italiano (dal 2008): Enrico Maria Carlini, TERNA, enricomaria.carlini@terna.it

SCOPE

The scope of SC C1 is to study economic and system analysis methods important for the development of power systems and to assist utilities to find the best solutions in various evolving, competitive and unbundled conditions in the context of the overall energy supply system and with social and environmental considerations.

The main areas of attention are:

- Methods and tools for power system static and dynamic analysis

- Planning predicaments and methods in competitive and regulatory structures

- Progress and new approaches in application of power system planning criteria and reliability (security and adequacy) assessment

- Capacity enhancement by use of risk-based security assessment and advanced information, communication and power-electronics technology for improving system stability and dynamic performance

- Future dependence, requirements and economy of ancillary services for frequency and voltage control and other system needs

- The impact of pricing and tariff methods for transmission services on system development.

- Asset management strategies in the definition of optimal policies

- Planning issues related to long distance transmission and international interconnections. System planning issues in newly industrialised and developing countries

- Impact on system development of new solutions and technologies in fields such as generation and demand side management (DSM)